What is the difference between the length and duration of the decoration?

The decoration cannot always be completed on schedule. What are the reasons? In addition to the various delays in decorating, the wrong estimated duration is one of the reasons. Different homes, different areas, different types of rooms, and different needs have different requirements for the duration of construction. How to correctly calculate the decoration period of your own house, how to avoid delays, and how to reduce the damage caused by the delay? This article for everyone to explain it!

Part1: The duration cannot be decided based on the specific circumstances

Due to the difference in the decorating company, the size of the decorating area, and so on, the decoration period of different people cannot be exactly the same. The following detailed look, regardless of the factors that appear in the decoration process, what factors will lead to different decoration period before decorating.

First, the factors that affect the length of decoration before decoration

1, the size of the decorative area

In general, the larger the decorating area, the longer the decorating time is naturally relative to the smaller area. Ordinary apartments of about 100 square meters may be decorated in more than a month, while villas in a few hundred flats may not be finished for six months.

2, how many decorating projects

The number of decorating projects and the complexity of decorating will obviously affect the duration of the project. There are many factors that will affect the number of decoration projects, such as the condition of the house before decorating, the decoration style, and the budget of the decoration. In general, second-hand housing may be longer than the rough housing period, because the second-hand housing also has a demolition job. In addition, such as the simple style of the house decoration is generally more simple than the Mediterranean, European style decoration.

Second, about 100 square home decoration period

The development of the decoration period requires the decorator to negotiate with the interior decoration company. Although there is not a very specific time period, due to the fact that many people nowadays use relatively simple decoration styles, the decorating projects are also common, so 100 square 2 rooms are used. For example, the decoration period of the house is generally not too different from the following arrangements.

1. Structure Dismantling: 1-2 days

Before the house decoration, the structure is generally demolition and reform according to the design scheme. The houses of small and medium-sized houses generally take 1-2 days. If your family does not have this item, you can subtract this time.

2, hydropower reform: 5-10 days

The hydropower transformation is the slotting, wiring, acceptance, etc., depending on the complexity of the project, generally takes 5-10 hours, sometimes even longer.

3, mud tile project: about 10 days

The tile project includes items such as kitchen and toilets, waterproofing, ceramic tiles, and the like, and the time required varies depending on the area of ​​the tiles to be tiled. Usually about 10 days, if the waterproof does not pass the acceptance, the time may be longer.

Decoration construction knowledge construction acceptance construction contract

1 2345 Next> Total 5 pages
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story

Long Radius Elbow refers to that  the radius of curvature is 1.5 times of the elbow pipe diameter; if greater than 1.5 times, that is bend. long radius elbow is the most common, usually the default is long radius, high pressure or high velocity areas will use long radius, if it is solid conveying bend pipe big resistance,will  use a larger radius. If there are no conditions or did not indicate  in the contract, the preferred is long radius elbows.

Product Name:Long Radius Elbow 
Size:DN10-DN2500
Materials: A234 WBP-WP1-WP12-WP11, A403 WP 304-304L-316-316L, A402 WPL3-WPL 6,A860 WPHY 42-46-52-60-65-70,PG370,C20
Thickness: 2mm-100mm 
Standard:GB/ANSI/ GOST/ JIS/ DIN
Crafts: Butt, Push System, Simmer 
Connection: Welding 
Package: Wooden boxes,Wooden pallets,According to customer requirements.
Brand Name: HY 
Place of Origin: China (Mainland) 
Certification: ISO.UKS.SGS.BV 
Application: Chemical, Water, Oil and gas, Electricity
Long Radius Elbow

Long Radius Elbow

Long Radius Elbow,Seamless Carbon Steel Elbow,Stainless Steel Elbow ,Long Radius Bend

CANGZHOU HAOYUAN PIPE FITTINGS MFG CO.,LTD , https://www.pipefitting-china.com