Mid-term acceptance effectively prevents rework

After the technology is delivered, it will enter the construction stage. The material acceptance is first of all. After the various materials purchased by the decoration company are shipped to the site, they must be accepted by the customer and signed and approved before they can be constructed. Materials that have not been accepted shall not be constructed. Without the acceptance of unauthorized construction, the decoration company will be responsible for the loss.

In recent years, the number of disputes caused by home renovations has increased. The phenomenon of dissatisfaction and rework afterwards has occurred from time to time. It is time-consuming, laborious and uneconomical. To prevent such incidents from happening, when rough and hidden works are completed and ready to enter the hardcover, It is best to carry out a focused inspection. We call it mid-term acceptance. In acceptance, if the owner is unsatisfied or has new ideas and wishes to make some partial changes, it is best to present it in time.

>>>How to Accept the Hidden Project of Hydropower Series in Home Decoration

Acceptance points

The customer, designer, project supervisor, and construction manager are involved. After acceptance, the intermediate quality report shall be signed and confirmed.
In order to satisfy both the decoration company and the consumer, the consumer must understand how to accept it. Consumers may check and accept their own home decoration according to the Beijing Municipal Home Decoration Engineering Quality Acceptance Regulations compiled by Beijing Building Decoration Industry Association.

Acceptance In addition to identifying the overall effect of decoration, the main thing is to see if the quality of the hand is satisfactory. Acceptance can be identified from the following aspects:

(1) The lighting circuit shall be laid in accordance with the regulations. The socket, lighting switch, main gate, and leakage switch shall have a certain height, and the kitchen and air-conditioning shall be laid in dedicated lines. The television antenna and telephone line shall be installed in a position convenient for maintenance.

(2) Drainage should be smooth, no leakage, backflow and water phenomenon, high-grade water parts without clamp marks and rubbing phenomenon.

(3) It is a new masonry wall to be vertical, the bricks have the same level of water, the joints are even and tidy, and the brick joints do not exceed 1 mm.

(4) It is the overall production error of the plane ceiling that does not exceed 0.5, the crack between the board and the board does not exceed 0.3mm, and the error of the plastic ceiling does not exceed 0.5mm.


5) It is the wood seal line, corner line, waistline veneer panel seam that does not exceed 0.2mm, the angle between the line and cable clip mouth does not exceed 0.3mm, and the interface between the veneer panel and the panel does not exceed 0.2mm, the sliding surface error is not Beyond 0.3mm.

(6) Fine wood products (curtain boxes, heating covers, wood retaining walls, wood cuts, package doors and door covers, window coverings, skirting boards, floral ornaments, decorative lines) and keels, linings and fabrics for fixed furniture shall conform to the design, Household requirements. The moisture content of wood used for fine wood products shall not be greater than 12%. The external materials used shall not have dead knots, insect eyes and cracks. Fine wood products and base must be studded firmly and loose. The liner and the panel must be firmly bonded and no layering or druming may occur.

(7) The construction quality is related to the quality of the construction team; it is also related to the unit price of the construction project. The best way is to sign a contract between the two parties before the start of construction to clarify the decoration requirements and acceptance criteria. Wire category. The power line should be laid with a dark pipe. The conductor shall be a copper plastic wire with a cross-sectional area of ​​BV ≥ 2.5 mm. The ground or wall shall be slotted with a hard metal extension pipe or a PVC rigid pipe, with 45 degree cement slopes on both sides to prevent Above the load is too large squash PVC board affect the future change line. Telephone lines, television signals, and audio connection wires are laid in separate branches and dedicated signal transmission lines are used, and there is a certain distance between them so that various signals do not interfere with each other. The shielded wire mesh openings of the TV signal transmission line should be cut in order to avoid short circuit to the center line, otherwise the image will be unclear.

Medium-term changes

In the construction process, it is inevitable that there will be some changes, what has been added, and what will be reduced. All these will require the signing of a change order. In the mid-term change, the customer, the designer, the person in charge of construction, and the project supervisor will be invited to the site. A good change order can be executed only after both parties have signed and approved. If the signature is not valid, there is no legal effect.