Bucket elevator nine-point installation instructions

1. Install the hoisting machine to fix the machine base firstly. The machine base should be fixed on a reliable basis. Then connect the machine barrel on the stand, and then connect the machine head and install the deceleration motor.
2. After the machine is installed and straightened, the barrel must be fixed with the floor board at the floor. If there are any attachments, support frames should be installed to prevent the entire machine from tilting and moving.
3, barrel connection promised to insert gaskets to ensure the seal.
4. The hopper of the hoist is installed on the hopper belt as required. The hopper with the hopper is put into the hopper at both ends. Over the head wheel and the bottom wheel, operate the hole early to make the connection. In the device hopper belt. The bottom wheel should be set to the highest position.
5. Calibrate the head axle to the horizontal and make the head and tail axles in the same vertical plane.
6. The bucket elevator is a vertical conveyor device. The center line of the head wheel, the bottom wheel and the barrel should be on the uniform vertical line. The deviation should not exceed 2 mm per meter and the accumulated deviation should not exceed 8 mm.
7. The hopper is installed in the hoisting machine, and there should be no deflection to cause the collision case to occur.
8. The tensioning device shall ensure that the hopper belt has the average tension necessary for normal operation.
9. When the hoisting machine is installed, lubricant should be added to each lubrication part to carry out no-load test. After the no-load test is normal, the load test can be carried out and put into production.