Want to renovate? What should you know first

1. Early Design - the main body 2. Chaigai - water reform 3. - 4. Woodworking - tiles 5. - 6. whitewashers topcoat - kitchen ceiling 7. - 8. cabinet installation - -9. Wooden door installation -10. Floor installation -11. Paving wallpaper -12. Radiator installation -13. Switch socket installation -14. Lamp installation -15. Hardware sanitary ware installation -16. Curtain Pole installation -17. Pioneering and cleaning -18. Furniture entry -19. Home appliance installation -20. Home accessories

1. Analysis of 20 links in the whole decoration process

(1) Preliminary design

The same is the construction, the difference between humans and bees is that the construction of bees is a reflection of instinct, and before humans are built, the mind and frame will first form in mind. Therefore, if home improvement is likened to a battle, then the preliminary design of home improvement is the " battle plan " of this battle and the " soul link " of home improvement. So again, Die Resistant describes all the issues that need to be paid attention to in the previous design in the last chapter of "Tang Liang Manufacturing", and I will not repeat it here.

In the preliminary design, one thing that students must do is to make a detailed measurement of their room. Everyone should not be lazy. It is better to measure it in person. The measurement content mainly includes:

1. Clarify the area involved in the decoration process. Especially the tile area, wall paint area, wallpaper area, floor area;

2. Specify the main wall dimensions. In particular, it is necessary to design the wall size of the furniture in the future.

I remember when the foreman of my family finally settled the total amount of bricks with me according to the " actual occurrence " , the area he measured was 10 square meters more than the area I measured myself. I was really crying. After re-measurement, the foreman turned around and reprimanded the bricklayer and said, " How do you measure it ?! " That's why I suggest you to measure it yourself. Many places of decoration are the same as those of being a human being - we don't necessarily understand very well, but we must know.

By the way, remind everyone that before starting construction, do n’t forget to go to the property to go through the construction formalities and pay the decoration deposit.

(2) Main body dismantling

Entering the construction stage, the main demolition and modification is the first project, mainly including demolition of walls, masonry walls, shovel wall skins, demolition of heating, plastic steel windows and so on. The main body dismantles and puts it bluntly, that is, the frame of the construction site is put up first.

(3) Hydropower transformation

Before the renovation of the water circuit, the disassembly and modification of the main structure should be basically completed. Between the two aspects of hydropower transformation and main body dismantling, some students may know that the first measurement of the cabinet should also be carried out. In fact, the first measurement of the so-called cabinets does not have any actual content, because the walls and floors are not processed, and the cabinet designer cannot give a specific design size, but only on the water outlet and hood socket reserved by the developer. Location, make some relevant suggestions. mainly includes:

1. See if the position of the socket of the range hood affects the installation of the range hood in the future;

2. See if the location of the water meter is appropriate;

3. See if the location of the water inlet is convenient for installing the sink in the future.

For the first measurement of the cabinet, students with little experience can completely complete it by themselves. After the waterway renovation is completed, it is best to make the bathroom waterproof immediately. The kitchen generally does not need to be waterproof.

Some students have always thought that before the decoration began, some of the main materials should be advanced. What I want to say is that unless the main materials needed for the main body dismantling and modification, the entry time of the main materials such as ceramic tiles and large core boards should be after the hydropower transformation. If the circuit transformation involves ground slotting, if the tiles and large core boards are not placed properly, it will be troublesome for workers to move around. The other two days ago, the " Mice " classmate also mentioned to me that her family had encountered the problem of workers coming back and forth to move bricks in the house. I would like to remind my classmates to pay attention.

(4) Carpentry

Woodworkers, bricklayers, and oilers are the " three brothers " in the construction process. The basic order of appearance is: wood - tile - oil. The basic principle of appearance is - who gets dirty first. " Whoever gets dirty first " is also one of the basic principles that determine the order of home improvement, which I will mention later.

In fact, carpentry work such as standing risers, making decorative ceilings, and plastering lines can also be considered as a detailed link of the main body dismantling in a certain sense. It does not conflict with the water circuit renovation, and sometimes needs some cooperation, such as mentioned in my last post -. "At home, keep false wall, then, to consider whether there is a false wall water lines, if any, should be allowed to water reform workers embedded pipe"

(5) Brick

If the workers are too busy, the foreman will usually let the " brickworker " enter the field before the " carpentry boss " has finished, which is normal because there is no conflict between the two.

In the process of " bricklayer's second child " operation, it also involves the installation of the following three links:

1. Installation of door stone and marble windowsill. The installation of the door stone can be completed together with the floor tile, or after the floor tile is installed, the marble window sill is generally installed after the window cover is completed, and the worker who installs the marble will prepare the glass glue, and the marble and the window cover are sealed with the glass glue Too.

2. Installation of floor drain. The floor drain is the first of the home improvement hardware, because it must be installed together with the floor tiles. Therefore, students should buy floor drains as soon as they start shopping for building materials.

3. Installation of range hood. The range hood is the first appearance of home appliances. After the kitchen wall and floor tiles are paved, you can consider installing the range hood.

"The second bricklayer " left the scene, at this time, the cabinet can be measured for the second time. To be precise, after the kitchen wall and floor tiles are pasted and the range hood is installed, the cabinet can be measured for the second time.

(6) Brush the wall paint

The " oilman's third " entered the field, mainly finishing the wall base treatment, painting the topcoat, and painting the furniture for the " woodworking boss " . For students who are going to paste wallpaper, they only need to let the " oiler's third son " do the primary treatment on the wall where the wallpaper is planned. As for whether to keep the top coat for the last time, personally feel that this problem is not necessary to be too real. From my experience of decoration, the significance of leaving a top coat is not very great, because the subsequent operations are no more dirty than painting. .

I'm writing here, dying to take a breath, chatting with everyone. When the " boss " , " second " and " third " have left one after another, many students will think that their decoration is almost over. In fact, according to the number of links, one third is less than one. The reason why everyone feels this way is that people generally understand that the decoration is just the " construction link " of decoration. In fact, the " installation link " of decoration is also the most important part of decoration.

If the " design link " is to " conceive " our future home, then the " construction link " is to " pack " our home and really say that " provisioning " is almost all in the " installation link " . Drink some water and continue ...

(7) Kitchen and bathroom ceiling

The ceiling of the cabinet as the installation link is still continuing the " packing " of the home. At the same time as the kitchen and bathroom ceiling, the kitchen and bathroom moisture-proof ceiling lights and exhaust fans (Yuba) should have been bought. Students are best to install kitchen and bathroom ceiling lights and exhaust fans (Yuba) at the same time, or leave thread ends and openings.

By the way, I firmly advocate the " decoration outsourcing theory " , even though the foreman and I promised his workers how to do the hydropower transformation, how to regulate, how to install aluminum buckle plates, how to make wooden doors, how to make them strong, and wallpaper. How to be professional, how to build cabinets and how to be practical ... In my opinion, all the decoration team can do is carpentry, tiling and painting

Because I believe in professional construction, the installation level of manufacturers, and the products of assembly line operations, most of them are slightly better than the manual work of the decoration team workers. Decoration is like a game. The bet is the workmanship of the workers, so I bet on " My workers are construction geniuses " .

Many students let decoration companies and decoration teams undertake a large number of construction tasks. One reason is that their time is not enough. Another reason is that they consider the problem of " convergence of projects " . I decided to outsource hydropower transformation, and some neighbors reminded me that it will be very difficult to connect in the future.

In fact, each part of the decoration is very independent. I remember that some students from the south asked questions about the decoration in his hometown. Every time, the owner invited a dedicated worker to do the decoration. Home decoration is such a thing. There is really no connection at all. Instead, students should play the so-called " cohesion " as much as possible in the home improvement process, accurately grasp the choice of materials, master some simple construction processes, and handle it well. This is the key to the relationship between workers and so on.

I really have to say that because of the problem of " connection " , such as who is responsible for the installation of later sanitary ware, lamps, hardware, etc., on the one hand, it depends on how you get along with the workers, and see if anyone is willing to " control " you in the end ; on the other hand, nobody really comes on the "tube" in the negotiations, I then again - "since God invented money, they did not solve the problem."

Decoration, quality always ranks first, is the main contradiction, is the principle. It is a minor contradiction that some links have problems because of " cohesion " . Students need to be cautious while preparing to make concessions on major contradictions and major principles because of minor contradictions.

(8) Kitchen cabinet installation

After the ceiling is over, the cabinet can be installed on the door. If it goes well, it can be completed in one day. At the same time, there are also a sink (not including water and water supply) and a gas stove. Before the cabinet is installed, it is best to coordinate the property to pass the gas, because the gas stove needs to be tested after the gas stove is installed.

Yes, just when it comes to ceiling, there is a problem worthy of our discussion, many students choose kitchen ceiling with water-resistant gypsum board waterproof paint, decoration team quote for more than 120 yuan per square meter, than the average aluminum buckle, PVC wall panel ceiling Are expensive. The gypsum board ceiling looks relatively flat visually, but in the future, if there is a problem with the top water pipe, or if the upper floor leaks, it is necessary to cooperate with the maintenance downstairs, etc., the gypsum board ceiling must be completely removed, which is much more troublesome than the buckle board ceiling. Therefore, you need to be careful when choosing a gypsum board ceiling.

(9) Installation of wooden doors

On the second day of cabinet installation, as long as the wooden door measurement was completed more than a month ago, it is now ready for installation. If it goes well, it is also a day. Hinges, door locks, and floor suctions must be installed at the same time as the door is installed. Students should prepare related hardware in advance.

If you want the wooden door manufacturer to install the window cover and pass, you should also measure it when the wooden door manufacturer measures, and install it at the same time as the wooden door installation. At the same time, you should consider installing the marble window sill backwards in the window cover After installation.

Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period tightly connected, the wooden door manufacturers should be asked to measure the size of the door opening as soon as possible after the main body is dismantled and modified. Regarding the treatment of door openings, everyone needs to pay attention to it. If the height of the door openings at home is inconsistent, it needs workers to treat them to the same height - good - looking.

(10) Floor installation

The floor can be installed on the second day of the installation of the wooden door. If it is successful, it will be one day. Floor installation needs to pay attention to the following issues:

1. Before installing the floor, it is best to let the manufacturer come to the site to investigate whether the ground needs to be leveled or partially leveled. Some decoration companies or refurbishment teams will recommend that the classmates level or partial level the floor, based on the actual survey of the floor manufacturer;

2. Before installing the floor, the floor of the floor at home should be cleaned and the floor should be dry, so do not use water during the cleaning process.

3. When the floor is installed, if conditions permit, the floor must be cut in the corridor. In the past, the forum also discussed this issue. Some students thought it was unethical to cut the floor in the corridor to pollute the public area. My idea is to clean it after finishing it, don't worry. Cutting the floor indoors will cause serious pollution to the walls. Similar to the cutting of artificial stone countertops in cabinets, I believe that the students who have been renovated will have some experience.

(11) Paving wallpaper

On the second day of floor installation, after the house is cleaned up, you can arrange for wallpaper to be posted. If it is smooth, it will be the same day. If conditions permit, the floor should be protected on the day when the wallpaper is laid. It does not matter if there are no conditions. It is no problem to leave the wallpaper glue left on the floor cleaned by Pioneer. Before Paving wallpaper, on the wall to try to make "have nothing."

(12) Radiator installation

On the second day after the wallpaper was laid, students who replaced the radiator or dismantled the radiator can steadily hang the radiator on the wall. It's the same time of day.

Wooden door - floor - wallpaper - radiator, this is a generally accepted correct installation sequence. The first installation of the wooden door is to ensure that the baseboard of the floor can be tightly connected with the door cover of the wooden door; the wallpaper is installed mainly because of the floor The installation is relatively dirty, dusty, and serious pollution to the wallpaper. Here again the principle of " whoever gets dirty first " that I said earlier is used. The radiator is finally installed because the radiator can only be installed if the wall wallpaper is paved.

The decoration process is designed step by step under various restricted and restricted conditions. Occasionally, there are exceptions. For example, the Holtz gate needs to be installed with the floor and then the door, but such exceptions are rare in the decoration process.

In addition, in front of me repeatedly saying "time of day", there is a layer of meaning to remind the students, "Day" for the entire renovation is not too long, so even if no installation conflicts, such as cabinets and doors, the students also try not to at the same time in an appointment two mounting time of the day, these "large" especially mentioned above, because the installation is critical to these "large", the best designed stare a scene, rather than "one mind " . Learn to comfort yourself - we are not that bad.

(13) Installation of switches and sockets

There is only one reminder: the students should have a detailed understanding or record of the number and location of switches and sockets in each natural room of the home, especially for the students who paste the wallpaper, sometimes the wallpaper worker is not responsible, the wallpaper hula The shop is up, he doesn't use a wallpaper knife to mark the hole where you switch the socket. Therefore, students still need to know what they know.

(14) Lamp installation

There is nothing to say about the lights. After the lamp is installed, the home is lit, farewell to the glare of the 100- watt incandescent light bulb during the decoration - it feels good.

(15) Installation of hardware and sanitary ware

The upper and lower water pipes, bathroom accessories, toilets, drying racks, etc. that I bought before are all installed together. After the previous " big items " are installed, the home is still very " cold " . After the lamps and hardware are installed, the home will " live " and really " live " . Is no exaggeration to say that the first time you turn on the water watching the water dragon "Wow, Wow," Wang Chu flow, the heart will be very beautiful; for the first time at home to newly installed toilet Chugong will great sense of accomplishment, yes, I also gave it a good name- " Virgo " .

(16) Installation of curtain rods

The installation of curtain rods marks the end of home improvement.

(17) Pioneering and cleaning

Don't install curtains before pioneering cleaning, remember to remind everyone in the " explaining curtains " post. When pioneering cleaning, do n’t have furniture and unnecessary household appliances in your home, try to keep as many “ flats ” as possible , so that pioneering cleaning can clean it thoroughly.

(18) Entering the furniture

Regarding the purchase time of furniture, my suggestion is that the earliest after the renovation of the water circuit is completed, in this way, we only know the basic size range of the furniture. Therefore, some students have rushed to put the furniture before the decoration       

(XIX) Home Appliances

At this time, the appliance should enter the site, the installation should be installed, ready to move in!

(20) Home accessories

Home accessories, the last step of home improvement, and have been transformed from decoration to decoration, including the installation of curtains are all home accessories. As for buying curtains, it is best to order furniture to avoid conflicting styles. Also includes home accessories can consider buying some green plants, wall paintings, furnishings crafts, etc., etc. ...... In short, Check-in, you can free play.

Second, the two divisions of the decoration process

Students who have read the first section may find it a bit messy. In order to facilitate you to further understand these 20 steps and some links that need to be noticed during the period, I will resist the addition of the 20 " stars " in the front and add 10 more. " Stars " , as follows:

1 Go through the construction procedures- 2 self-measurement- 3 preliminary design- 4 main body dismantling- 5 wooden door manufacturers home measurement- 6 cabinet first measurement- 7 water and electricity transformation- 8 bathroom waterproofing- 9 main materials Woodworking approach --10 --11 tile (install window sill, the drain) --12 --13 hood mounted cabinets topcoat paint the second measurement --14 --15 --16 pass gas in the kitchen ceiling - —17 cabinet installation (simultaneous installation of sink and gas stove) ——18 wooden door installation ——19 floor installation ——20 paving wallpaper ——21 radiator installation ——22 switch socket installation ——23 lamp installation ——24 hardware sanitary ware install curtain rod installed --26 --25 --27 furniture pioneering approach cleaning appliances installation --29 --28 --30 move home accessories

(1) Four-step division of the whole decoration process

In terms of thick lines, according to the 20 links mentioned in the beginning of the article, the whole process of decoration can be roughly divided into the following four links:

1. Design link; ( 1 )

2. Construction link; ( 2-6 )

3. Installation link; ( 7-16 )

4. Closing link. ( 17-20 )

I ’ve booked it, I do n’t think it ’s necessary

(2) Six-step division of the whole decoration process

According to the characteristics of the project, according to the 30 links just mentioned, the whole decoration process can also be divided into the following six steps:

The first step: design ideas; ( 3 )

The second step: main body dismantling and modification; ( 4 )

The third step: concealed works; ( 7 )

The fourth step: covering the project; ( 10 , 11 , 14 , 15 , 19 , 20 )

The fifth step: installation stage; ( 17 , 18 , 21 , 22 , 23 , 24 , 25 )

The sixth step: the closing stage. ( 26 , 27 , 28 , 29 , 30 )

Specific instructions:

1. In order to distinguish it from bees, we must first have design ideas;

2. The main body is dismantled and reformed to completely transform the rough house into a construction site. The content of the main body dismantling and reforming has just been mentioned above- " demolition of walls, masonry walls, shoveling of wall skins, dismantling of heating, replacement of plastic steel windows, etc. " , and some carpentry work;

3. Concealed engineering is equivalent to " medical surgery " . Hidden works must be done first, which is what everyone often says, "the renovation begins, hydropower first " ;

4. Covering the project is like " dressing " the house. Carpentry window cover, pass, bricklayer tiling, door stone installation, window sill installation, oiler painting -the three items of wood, tile, and oil belong to the basic project, after the buckle ceiling, paved floor, wallpaper , Even if the clothes are worn out;

5. During the installation phase, the functional realization is mainly completed. Including: cabinets, wooden doors, radiators, switch sockets, lamp installation, hardware, sanitary ware, curtain rods ... Each item has its established functions;

6. In the final stage, to put it bluntly, it is to complete the factors that do not yet constitute a " movable move " .

By analyzing "the Two renovation process," the second section, and then come back to re-watch the first "whole renovation process 20 link analysis", students may be more easily understood.